top of page
Building Overview

The St. Annes Building expansion consists of two three story apartment complex. There are two wings of residential apartments with the central area on each floor with various services for the residents of the building. The Building is about 16 Million dollars and 90,000 square feet. Construction on the project began in August 2017 and expected to finish in 2020

About The Site

The Capstone Project Electronic Portfolio (CPEP) is a web‐based project and information center. It contains material produced for a year‐long Senior Thesis class. Its purpose, in addition to providing central storage of individual assignments, is to foster communication and collaboration between student, faculty consultant, course instructors, and industry consultants. This website is dedicated to the research and analysis conducted via guidelines provided by the Department of Architectural Engineering. For an explanation of this capstone design course and its requirements click here

News Feed